Each test in the I3C CTS will contain:

  • A clear purpose
  • References
  • Resource requirements
  • Tracked last technical modification
  • Discussion
  • All test case detail (i.e., setup, procedure, results, problems).

DC/AC parametric requirements will be embedded in each test, not split out into a separate PHY-related CTS or subsection.

FAQ Category:

FAQ Type: 
I3C